Types of Maintenance
Choose the maintenance plan that best fits your needs:
A
Maintenance Type A
Monthly
- 1 general overhaul with consumable replacement (mandatory annually or based on operating hours)
- 11 monthly periodic inspections (monthly on-site inspection to start the generator and check functionality)
- Accidental interventions (whenever required)
B
Maintenance Type B
Quarterly
- 1 general overhaul with consumable replacement (mandatory annually or based on operating hours)
- Quarterly periodic inspections (on-site every 3 months to start and check generator functionality)
- Accidental interventions (whenever required)
C
Maintenance Type C
Semi-Annual
- 1 general overhaul with consumable replacement (mandatory annually or based on operating hours)
- Semi-annual periodic inspections (on-site every 6 months to start and check generator functionality)
- Accidental interventions (whenever required)
Periodic Inspection Operations
The complete monthly inspection program (or whenever required) ensures failure prevention and optimal generator performance:
- Monthly inspection—or whenever required—of the generator operating mode to prevent potential failures
- Inspection of joints between different components
- Inspection of engine speed and adjustment if needed
- Inspection of engine oil level and topping up if required
- Inspection of the air filter clogging indicator
- Inspection of hose condition
- Inspection of the alternator
- Inspection of the engine belt
- Inspection of the battery charger
- Inspection of the exhaust connection, muffler, and exhaust manifold
- Inspection of connection continuity
- Inspection of fuse holder contacts
- Inspection of indicator lights on the control panel
- Inspection of voltmeter and ammeter functionality
- Measurement of generator terminal voltage
- Frequency measurement
- Inspection of the automation and control panel
- Inspection of the cooling circuit and topping up antifreeze when required
- Inspection of the fuel supply and distribution system
- Inspection of battery condition and topping up with distilled water when needed
- Inspection of protection circuits
- Adjustments and final test by restarting the generator set for 10 minutes, with or without load
- Performing a load test by simulating a power outage
- Other similar inspection/cleaning operations performed whenever required to ensure proper functioning of the installations and equipment